Open Access
Fig. 4

Download original image
Geological cross-section along Tunnel-de-Caluire Motorway (north tube; see location in Fig. 2). Re-interpreted and re-drafted after the initial profile established right after tunnel drilling execution.
Coupe interprétée le long du tunnel de Caluire.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.